More than a Story
Since its establishment in 2015, ENELCA has established itself as a regional electricity transmission company specializing in the structuring, development, construction, and operation of transmission lines with high technical and safety standards.
We stand out for guaranteeing coverage and availability of electrical service, connecting communities, businesses, and projects with a reliable network that drives regional development.
Committed to ethics, transparency, and operational excellence, we work under strict regulatory compliance and risk management policies, ensuring institutional accountability in every project we lead.

Projects
destacados
Cereté 110 kV substation and associated transmission lines
The project, designed, built, and put into commercial operation by ENELCA in January 2019, included the supply and installation of the new Cereté 110 kV Substation in a double-bus configuration with a transfer switch, the construction of a double-circuit line of approximately 6 km for connection to the Chinú–Montería 110 kV line, the installation of two line bays, and the expansion of the busbar for future transformer bays.
Sustainability
At ENELCA, we promote environmental sustainability through actions aimed at mitigating greenhouse gases and protecting the environment.
9,066 ton CO2-e/year
9,838 ton CO2-e/year
12,209 ton CO2-e/year
201,8 ton CO2-e/year
At Enelca, we are committed to Ethics, Transparency, and Corporate Risk Management, LAFT, and Anti-Corruption.
We have our Corporate Transparency Channel.
Conduct
CREG Resolution 080 of 2019 establishes the general rules of market conduct for Enelca as a developer of residential electric power utility services. In accordance with Articles 9 and 25, links to Enelca's Rules of Conduct and the communication sent to the Superintendency of Residential Public Utilities are provided below.